Friday, 11 November 2016 17:27

The Early Bird Gets the Coolest Pictures

Written by
Rate this item
(0 votes)

Week 20 of The Big Build finds the construction crew pouring the cement flooring just after 4:00AM. 26 loads of concrete are needed to complete this phase of the project. The steel arrives next week. Look for cool pictures of cranes and large beams of steel floating above the ground.

IMG2153
IMG2152
IMG2151
IMG2149
IMG2148
IMG2143
IMG2140

Read 240 times Last modified on Thursday, 17 November 2016 17:49
Brian Curran

Brian is the owner of Abacab Designs, a graphic design and digital marketing company based in Marlborough, CT.

www.abacabdesigns.com
More in this category: « Smooth Moves Cranes and Beams »